Tape Plant Log sheet / Raffia Plant - Woven Sack Tutorials / Quality Management System / QMS

 A quality management system (QMS) is defined as a formalized system that documents processes, procedures, and responsibilities for achieving quality policies and objectives. A QMS helps coordinate and direct an organization’s activities to meet customer and regulatory requirements and improve its effectiveness and efficiency on a continuous basis.

ISO 9001:2015, the international standard specifying requirements for quality management systems, is the most prominent approach to quality management systems. While some use the term "QMS" to describe the ISO 9001 standard or the group of documents detailing the QMS, it actually refers to the entirety of the system. The documents only serve to describe the system.



A QMS should consistently produce the same result; quality must be built, not inspected, into products. An efficient QMSs has processes and support systems that are simple and clearly laid out. A good QMS will also have well trained employees who understand the system and purpose of the system.

If we talk about QMS in woven Sack industry, there are different departments in which we have to prepare different types of QMS sheet.

For Tape Plant there is a log sheet given below, it should be modified as per the need and available data. 

LOGO

Your Company Name

QUALITY MANAGEMENT SYSTEMS

TAPE LINE PRODUCTION

DOC ID NO :  FMT PROD/01

REV. NO:00      REV. Date

ISSUE NO:00 ISSUE DATE:01-01-2022

Page 1 of 1

OPERATOR NAME

DATE :

 

W.M.  01

 

W.M.  04

 

PRODUCT NAME :

 

W.M.  02

 

W.M.  05

 

SHIFT :

 

W.M.  03

 

W.M.  06

 

FITTER / HELPER NAME

CONTROL PARAMETERS READING

1

3

TIME

9

11

1

3

5

7

 

2

4

Drier

 

 

 

 

 

 

Recipie

PRODUCTION DETAILS

Feed Zone

 

 

 

 

 

 

PP

 

 

 

 

 

 

BARREL HEAT -  ZONE 1

 

 

 

 

 

 

HDPE

 

 

 

 

 

 

BARREL HEAT -  ZONE 2

 

 

 

 

 

 

FILLER

 

 

 

 

 

 

BARREL HEAT -  ZONE 3

 

 

 

 

 

 

Master Batch

 

 

 

 

 

 

BARREL HEAT -  ZONE 4

 

 

 

 

 

 

BRIGHTNER

 

 

 

 

 

 

BARREL HEAT -  ZONE 5

 

 

 

 

 

 

UV

 

 

 

 

 

 

BARREL HEAT -  ZONE 6

 

 

 

 

 

 

LLDPE

 

 

 

 

 

 

sc adapter

 

 

 

 

 

 

Super
White

 

 

 

 

 

 

SCREEN CHANGER

 

 

 

 

 

 

RP

 

 

 

 

 

 

MP adapter

 

 

 

 

 

 

TOTAL PROD =

 

 

 

 

 

 

MELT PUMP TEMP

 

 

 

 

 

 

RUNNING PROCESS CHECKING

Die Adapter

 

 

 

 

 

 

SR. NO.

Party

TIME

DENIER

T. W.

GPD

DIE HEAT ZONE 1

 

 

 

 

 

 

1

 

 

 

 

 

DIE HEAT ZONE 2

 

 

 

 

 

 

2

 

 

 

 

 

DIE HEAT ZONE 3

 

 

 

 

 

 

3

 

 

 

 

 

DIE HEAT ZONE 4

 

 

 

 

 

 

4

 

 

 

 

 

DIE HEAT ZONE 5

 

 

 

 

 

 

5

 

 

 

 

 

DIE HEAT ZONE 6

 

 

 

 

 

 

6

 

 

 

 

 

Quenching tank

 

 

 

 

 

 

7

 

 

 

 

 

P1 (Actual)

 

 

 

 

 

 

8

 

 

 

 

 

P2(Set)

 

 

 

 

 

 

9

 

 

 

 

 

P3(Actual)

 

 

 

 

 

 

10

 

 

 

 

 

Extruder

 

 

 

 

 

 

11

 

 

 

 

 

MELT PUMP

 

 

 

 

 

 

12

 

 

 

 

 

Take off

 

 

 

 

 

 

Breakdown :-

 

 

 

 

 

 

Godet 1

 

 

 

 

 

 

 

 

Godet 2

 

 

 

 

 

 

 

 

Godet 3

 

 

 

 

 

 

 

 

Oven

 

 

 

 

 

 

 

 

STRECH RATIO

 

 

 

 

 

 

 

 

WINDER

 

 

 

 

 

 

 

 

TAPE WIDTH

 

 

 

 

 

 

 

 

DENNIER

 

 

 

 

 

 

Wastage:-

 

STRENGTH

 

 

 

 

 

 

 

 

ELONGATION

 

 

 

 

 

 

 

 

 

 

 

 

 

REMARKS / NOTE : -

Prepared By :    _________________                                               

 

Approved By :    ____________

(Operator)

 

(Manager)

Comments

Post a Comment

Get Here All Formula

Popular posts from this blog

Woven sacks Circular looms formulas

Some useful calculation for Tape Plant extrusion process (Woven Sack/ Raffia)

Woven Sack (Raffia) Tutorial - Tape Plant Formula and important calculations